Horse Fair crossing changes: September to November 2019

Kingston Council will shortly be commencing work at the Horse Fair/Clarence Street junction in Kingston (near TK Maxx). Works will involve changing the current staggered pedestrian crossing over Horse Fair to a wider, staggered Toucan crossing (one that can be used by both people walking and people on bikes). This will also replace the separate cycle crossing which is only traffic light controlled half way across Horse Fair which we consider a current safety issue.

These works are taking place as part of the Mini Holland (or Go Cycle) projects in the Borough. The works in this area are due to be completed by mid-November 2019.

We asked for the Horse Fair crossing to be ‘straight across’ the road when it is changed rather than continuing to be staggered (in 2 stages). However, traffic modelling of this change suggested it would have caused delays to motor vehicles and therefore unfortunately became a discarded option. We will nevertheless continue to campaign for people taking sustainable options to travel being prioritised above cars as this is the best way to create positive changes in the way people choose to travel across Kingston.

IMG_20190922_120728

Current staggered crossing over Horse Fair

Changes in this area will also involve building a new pedestrian and cycle crossing over Clarence Street (outside TK Maxx) to join the Horse Fair crossing to upgraded cycle parking outside TK Maxx and an enhanced cycle path towards the West side of Kingston Bridge.

Whilst the works are underway, the cycle parking outside TK Maxx will unfortunately be unavailable but we have been informed by the Council that temporary cycle parking will be installed on the opposite side of the road near to John Lewis.

When the works are complete, the current cycle stands will be re-installed and additional ones will be installed too. This will significantly increase the number of bikes that can be parked here. We are really pleased that more cycle stands will be installed in this extremely popular area for bike parking.

As demand for cycle parking in Kingston town centre increases, we’ve provided the Council with other suggested locations for cycle parking and await a response on which, if any, will be taken forward. Please let the Council know if you have any suggestions for bike parking in the Borough.

Suggested response to Mini Holland Consultations July 2016

Kingston Council have four consultations open until 18 July 2016 on their Go Cycle or Go Programme (previously Mini Holland).

http://consult.kingston.gov.uk/portal/planning/go/consultations_summer_2016/

The schemes need real improvement. So please complete all four and call for the routes to be completed and cycles to be separated from both motors and pedestrians.

These are our brief suggested responses which please feel free to use as the basis for your own responses. Do complete the “comments” sections – the questions asked are closed and will not allow you to seek what cyclists really want.
Continue reading

Mini Holland Consultations

Kingston Council have four Consultations open until 18 July 2016 on proposed Go Cycle or Go Programme (their branding for Mini Holland) cycle routes.

  • Kingston Station
  • Wheatfield Way
  • Kingston to Surbiton
  • Fountain Roundabout, New Malden (below)

Fountain Roundabout proposed layout

You can access the consultations here;

http://consult.kingston.gov.uk/portal/planning/go/consultations_summer_2016/

Please complete all four and call for fully protected space for cycling separate from both motor traffic and pedestrians. Our initial view is that the proposals are disappointing. Mini Holland and the Mayor’s Cycling Vision for London were intended to be transformational. Kingston’s proposals have a lot of space shared by pedestrians and cyclists, creating conflict for both. Junctions which are challenging for inexperienced cyclists are sometimes ignored.

There are some promising features such as segregated cycle tracks, but the schemes need real improvement if they are to work. We managed to get the Council to improve Portsmouth Road so please let’s get these schemes improved by completing the consultation.

Our detailed discussion of all 4 schemes is publicly available on Cyclescape.org;

http://kingston.cyclescape.org/

Please feel free to contribute.

 

Cycle track on Wheatfield Way

We understand this proposal will be consulted on in June 2016. It is proposed to install two way fully segregated cycle tracks (3m) on the east (Fairfield) side of Wheatfield Way from College Roundabout to the station except at Old London Rd and Wilkinsons. At this pinch point shared space of at least 3.6m width is proposed for a short distance. Kingston’s mini Holland bid envisaged the two way track being continuous with the one way system being reduced from three to two motor lanes at this point. The Borough Officers tell us this is not possible because Transport for London’s traffic modelling suggests unacceptable delays would be caused.

There will also be more direct cycle crossings at Palmers Crescent and Lady Booth Road. Consultation on 20mph (currently 30mph) speed limit and raised crossings and junctions. Wider pedestrian and cycle crossings opposite Old London Rd are also proposed. There is also to be a link from Old London Road to Castle Street, the details of which, so far as we are aware, remain to be decided.

In our view this is a great proposal; a safe space for cycling on a scary urban gyratory. There are also urban realm improvements and a reduction in the severance caused by the ring round. Sadly there is one major defect; shared space does not work on a transport cycling route. We suggest a reduction to two traffic lanes could be trialled (a practice favoured by new Mayor, Sadiq Khan) for the short “pinch point” section outside Wilkinson’s; it may be the world does not end and remember TfL’s traffic modelling does have a record of not reflecting reality.